Heating & boilers

Gas Safe heating engineers across Bristol.

Boiler repairs, servicing, new installations and full central heating. Local, local, responsive, and straight with you on price.

Gas Safe registered (reg. 970515) ·

What we do

Boiler repairs

Boiler not firing up or losing pressure? We diagnose and fix, fast.

New boiler installs

Supply and fit a new boiler, with a fixed price and warranty.

Servicing & safety

Annual servicing and Gas Safety certificates (CP12) for homeowners and landlords.

Central heating

Full systems, radiators, smart controls and power flushes.

Why trust us with your heating

Gas Safe registered.

Gas work is completed by a Gas Safe engineer (reg. 970515).

Fair, fixed prices.

A clear price before we start. No call-out surprises, no padding the bill.

We actually turn up.

When we say we’ll be there, we’re there. Same local team, every time.

Fully insured.

. If something’s not right, you’re covered.

The difference

Anyone can put a boiler on the wall.

Hanging it is the easy part. What keeps it running for ten years is everything around it. That’s the part people skip.

How it usually gets done

The new boiler goes on the old pipework as it is.

How we do it

We flush the old system out first, then add fresh inhibitor to keep it clean. Your new boiler starts on clean water, not twenty years of sludge.

How it usually gets done

Limescale never comes up.

How we do it

Bristol water is hard, and hard water furs up a boiler fast. So we fit a scale reducer where the water needs one. Small part. Adds years.

How it usually gets done

Gas pressure and pipe size are never checked.

How we do it

We check both at the meter before we quote. If your gas supply can’t run the boiler properly, you hear it from us first. Not after it’s fitted.

How it usually gets done

The warranty is taken for granted. Nobody reads the small print.

How we do it

A long warranty comes with rules. The system has to be prepped right, with a filter, registered, and serviced every year. Miss one and the cover can be dead from day one.

How it usually gets done

Paperwork “in the post”.

How we do it

We register the job and get your certificate sent out. You don’t have to chase anyone for it.

How it usually gets done

You hear from them again once something has already broken.

How we do it

We set the system up to be left alone. Then we tell you when your yearly service is due, so the warranty stays alive.

On price

What you’re actually paying for.

The cheap quote and the good quote are rarely the same job.

Before you say yes to any boiler quote, ask what happens to the rest of the system. We’ll tell you what we’re doing to yours, and why, before we start.

We heard of a fitter who put a boiler on a gas supply too weak to run it. He knew. He fitted it anyway, because he wanted his thousand pounds. The homeowner keeps the fault, the cold house and the bill to sort it out.

That’s what a cheap quote really buys. The flush, the inhibitor, the scale reducer, the pressure test — none of it shows. The boiler still lights on the first morning. It just never gets to year ten, and the warranty meant to cover it was dead from the start.

Boiler playing up? Let's sort it.

Arrange a free, no-obligation home visit with Josh & Rich. We’ll listen first and follow up with a clear written quote.

Ring usArrange a free visit